Home > Products & Services > Perforation Services > Completion Perforation
Completion Perforation
Production perforation is a critical phase in the lifecycle of a well, where the casing and cement are strategically pierced to establish a controlled flow path between the reservoir and the wellbore. This process directly impacts well productivity, reservoir management, and long-term performance.
At TCO, we understand the complexities and risks associated with perforation operations. Poorly executed perforations can lead to formation damage, uneven flow distribution, reduced recovery, and costly interventions. That’s why our solutions are engineered to deliver high-precision perforation, minimal formation disruption, and optimized flow efficiency, especially in challenging environments such as HPHT wells and deepwater operations.
Whether you’re targeting conventional reservoirs or complex offshore fields, our perforation solutions are designed to maximize reservoir connectivity, minimize risk, and drive sustainable production outcomes.
For new completions and reservoir stimulation, we deliver Tubing Conveyed Perforating (TCP) solutions that maximize connectivity, maintain well integrity, and reduce intervention.
Our independent and flexible approach means you get the most suitable combination of charges, guns, and firing systems. Not just a one-size-fits-all package.
Features
Deep-penetrating charge systems for enhanced reservoir connectivity
High-underbalance and clean-up tools for debris management and reduced skin
Flexible gun designs with multiple OD ranges, phasing, and shot density options
Initiation options: Pressure, mechanical, and electronic firing systems, all with redundancy
Validated design: API RP 19B data, simulation, and optional testing
Benefits
Optimized Productivity: Clean, deep tunnels that maximize reservoir inflow
Reduced non-productive time: Efficient perforations minimize the need for remedial work.
Customized design: Expertise that ensures the correct system for application
Agile delivery: Local teams that move fast to meet tight project timelines
Agile Delivery. Local Teams that Move Fast to Meet Tight Project Timelines.
Applications
Production perforating in vertical, deviated, or horizontal wells.
Long-interval TCP for high-pressure completions.
Pre-stimulation and post-frac optimization.
Multi-zone or selective completion strategies.