Proven Technology
Case Studies
All Products
APRS
Chemical Injection
Glass Plug
All Applications
DEEP WATER
OFFSHORE
ONSHORE

TDP-3E plug saves 20 million NOK

Remote glass barrier plug installed with electronical device

World’s first installation of TDP-Nonex plug in UAE

TDP-PO saves costly rig hours

DSBP prevents 8000 barrels of brine losses

TDP-3 plug opened after 10-month suspension

DTHP – Retrievable deployed for long-term well suspension

Protecting casing integrity in North Sea well

U-tube prevented in West Africa

Eliminating need for nitrogen cycling

First DTHP with fluid bypass sleeve installed

Shell saves 24 hours of rig time with TDP-3E plug

Operator saves $12 million with remote TDP-2 operation

TDP-3 plug saves operator $6 million

Chemical Injection System prevents halite build-up

First TDP-NonEx deployment on NCS

TDP-3E plug saves 20 million NOK

Single-ended control line challenge solved

Enabling reliable lower completion

TDP-NonEx plug saves 3 days per well

Improved efficiency for ENI’s Goliat completion

U-tube challenge solved with FA Valve

APRS prevents subsea casing collapse

Debris Suspension challenge solved with TDP-PO

First Tubing Disappearing Plug installed